Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | DARIN |
Model Number : | DRD100/300 |
Certification : | CE ISO9001 UL |
Price : | USD 26000~ USD 110000 |
Payment Terms : | L/C, T/T, Western Union, MoneyGram |
Supply Ability : | 50 SETS PER YEAR |
Delivery Time : | 45 WORKING DAYS |
Dencal Care Clean Teenth Pet Treat Machine Dog Snack Extruder
Introduction
DRD-100/DRD-300 Pet treat extruding line is suitable to make dental pet treat for dog, the shapes and sizes can be various by changing the dies. The whole line is continuous and automatic.
Raw materials: Pet Treats /dog Chews Food Processing Equipment adopts corn starch, potato starch, animal meat, rawhide, etc as raw materials.
Products: twist, double colors, core-filling pet treats and so on.
Capacity: 100kg/hr for DRD-100, 150kg/hr for DRD-300
Flow chart: Mixing system---Extrusion system—cutting system--Drying system--- Packing system
Voltage in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers’ Local voltage according to different countries.
Machines materials: All the machines are made by stainless steel, dog chewing food machine is with reasonable design and with high automation; the screws are made by alloy steel, with building block system structure and self-cleaning function.
Technical Parameters
Output | Installed Capacity | Actual Capacity | Voltage / Frequency | Dimension |
100-150kg/hr | 145kw | 102kw | 380V / 50Hz | 30 x 5 x 3m |
Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply
for the Visa to client’s country immediately; normally the vessel
needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our
engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production at shortest
time.
4. Our engineers have responsibility to train and teach the workers
how to operate, clean, maintain and repair all the machines, until
the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we
supply 1 year guarantee from the date of completion of
commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and
daily salary USD 100 are on client’s account.
Why Choose Us?
1. Germany WEG motor, three years worldwide guarantee
2. Siemens PLC and touch screen to control the whole line, all faults will display on the touch screen
3. ABB or Schneider electric parts
4. NSK bearings
5. All parts touch with raw materials or final products are made of stainless steel 304
6. 24V operation voltage, assure the safety of operators
7. Three kinds of protectors to keep machine and operator safe: over-heating, over-current, over voltage.
Machinery Show
Sample Show
Factory Show
![]() |