Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Darin |
Model Number : | DR-126 |
Certification : | ISO CE |
Price : | negotiable |
Payment Terms : | L/C, T/T |
Supply Ability : | 100 sets/year |
Delivery Time : | 35-45 days |
Application: | Meat Foods. |
Machine Material: | Stainless Steel |
Type: | DR-126 |
Capacity: | 200-300kg/hr |
Certification: | CE & ISO9001 |
Place of Origin: | Jinan, Shandong, China. |
Motor: | WEG, Germany |
Electric Parts: | ABB, Switzerland or Schneider, France |
PLC and Touch Screen | Siemens, Germany |
Bearing: | NSK, Japan |
Voltage / Frequency: | Customized |
Operation: | PLC screen control. |
Payments: | T/T, L/C, |
Delivery time: | 35 working days. |
1. Motors are from WEG, Germany, which has 3-year world-wide guarantee;
2. Electric parts are from ABB or Schneider, easy to find
replacments at local market;
3. PLC and touch screen are from Siemens, Germany to realize easier
operation and less labor quantity;
4. While faults occurred, relevant information will be displayed on
touch screen, easy to settle the problem;
5. Control cabinet has 24V safe voltage (not 220V), which could
protect the operator even electric leakage occurred;
6. Three kinds of protectors to keep machine and operator safe:
over-current protector, over-voltage protector and over-heat
protector;
7. All the cover body, mesh belt and parts touching with materials
or final products are made by stainless steel 304.
Commissioning Service
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply
for the Visa to client’s country immediately; normally the vessel
needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our
engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production at shortest
time.
4. Our engineers have responsibility to train and teach the workers
how to operate, clean, maintain and repair all the machines, until
the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning
service, and we supply 1 year guarantee from the date of completion
of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and
daily salary USD 100 are on client’s account.
![]() |